Question
The figure shows a tank made up of 3 sections. Cuboid H with a square base of side 25 cm and height 46 cm. Cube J with a side of 14 cm. Cuboid K that is 78 cm by 20 cm by 47 cm. Water from a tap above flows down at a rate of 2.4 litres per minute while water is drained out from the bottom at a rate of 2 litre per minute. How long did it take to fill up the tank to a height of 70 cm from the base? Give the answer in minutes correct to nearest whole number.
3 m

Click button first when a symbol is required. X

The figure shows a tank made up of 3 sections. Cuboid H with a square base of side 25 cm and height 46 cm. Cube J with a side of 14 cm. Cuboid K that is 78 cm by 20 cm by 47 cm. Water from a tap above flows down at a rate of 2.4 litres per minute while water is drained out from the bottom at a rate of 2 litre per minute. How long did it take to fill up the tank to a height of 70 cm from the base? Give the answer in minutes correct to nearest whole number.