Question
PSLE
One copier took 50 minutes while another took 70 minutes to print the same number of leaflets. The faster copier printed 8 more leaflets per minute than the slower one.
  1. The slower copier completed the job at 1.33 p.m. At what time was the printing started?
  2. What was the total number of leaflets printed by the two copiers?
4 m
(a)

Click button first when a symbol is required. X

(b)

Click button first when a symbol is required. X

PSLE
One copier took 50 minutes while another took 70 minutes to print the same number of leaflets. The faster copier printed 8 more leaflets per minute than the slower one.
  1. The slower copier completed the job at 1.33 p.m. At what time was the printing started?
  2. What was the total number of leaflets printed by the two copiers?