Level 3 PSLE
The photocopying rates of two machines A and B are as shown. Both machines were use to make a copy of a set of notes which had been divided into teacher set and student set. Machine A took 7 minutes is to photocopy teacher set and Machine B took 9 minutes to photocopy student set.
  1. How many pages were there altogether in the set of notes?
  2. Another copy of the same set of notes was made using Machine B only. How many minutes did Machine B take?
4 m
Level 3 PSLE
One copier took 60 minutes while another took 100 minutes to print the same number of leaflets. The faster copier printed 6 more leaflets per minute than the slower one.
  1. The slower copier completed the job at 2.00 p.m. At what time was the printing started?
  2. What was the total number of leaflets printed by the two copiers?
4 m
Level 3
When both printers U and V are used, a collection of books can be printed in 3 hours. While printing, Printer U broke down. As a result, it took 113 hours to complete printing. If it would take Printer V 4 hours to print the collection alone,
  1. how long would it take to print the collection of books using only Printer U? Express your answer in hours.
  2. how long was Printer U used before it broke down? Express your answer in hours.
4 m
Level 3
During Christmas, Vincent's candle and Ethan's candle were placed on an altar. Vincent's candle was 3 cm longer than Ethan's candle. Vincent's candle and Ethan's candle were lit at 5:30 p.m. and 9:00 p.m. respectively. They burnt down to the same height at 10:30pm. At 1:30 a.m., Ethan's candle was burnt out while Vincent's candle was burnt out at 3:30 a.m. Find the original heights of Vincent's candle and Ethan's candle.
4 m
Level 3
If Albert and Marvin work together, they can complete a job in 14 days. If Albert and Marvin worked together for 7 days, followed by Marvin who worked alone for the next 21 days, they can finish off the job.
  1. How long can Marvin finish the work alone? Express the answer in days.
  2. How long can Albert finish the work alone? Express the answer in days.
4 m
Level 3
If Joey and Vic work together on a project, they will complete it in 4 days. If Vic were to work with Richard on the same project, they will take a day longer. If Richard and Teddy work together, they will take 100% more time than Joey and Vic. If Joey and Teddy were to work together, how many more days will they take to complete the project compared to Vic and Richard working together?
4 m
Level 3
If Bill and Henry paint a house, they take 24 days to finish painting. If Kenny and Bill paint the same house, they take 8 days to finish painting. If Henry and Mark paint the same house, they take 12 days to finish painting. How many days do Kenny and Mark take to paint the house if they work together?
4 m
Level 3 PSLE
The figure shows an empty tank placed below two taps A and B. It takes 10 min to fill the tank with Tap A alone and 2 min Tap B alone.
  1. With only Tap A turned on, what fraction of the tank will be filled in 1 minute?
  2. Starting with an empty tank, how long does it take for both taps together to fill 14 of the tank? Give your answer in seconds.
3 m
Level 3 PSLE
The figure shows Tap A, Tap B and an empty tank with a capacity of 54.2 litres. Water flows Tap A at 3.1 litres per minute and from Tap B at 2.9 litres per minute. Tap A was turned on first. Tap B was turned on 2 minutes later. The taps were turned off at the same time when the tank was completely filled without overflowing. How much water flowed from Tap A?
4 m
Level 3
A tank is to be filled to the brim. Tap A takes 20 minutes to fill the tank while Tap B takes 15 minutes to fill it. How long will it take to completely fill the tank with water if both the taps are turned on at the same time? Leave the answer in minutes and round off to 1 decimal place.
4 m