Question
The figure shows a tank made up of 3 sections. Cuboid C with a square base of side 4 cm and height 21 cm. Cube D with a side of 12 cm. Cuboid E that is 68 cm by 15 cm by 48 cm. Water from a tap above flows down at a rate of 3.6 litres per minute while water is drained out from the bottom at a rate of 2 litre per minute. How long did it take to fill up the tank to a height of 66 cm from the base? Give the answer in minutes correct to nearest whole number.
3 m

Click button first when a symbol is required. X

The figure shows a tank made up of 3 sections. Cuboid C with a square base of side 4 cm and height 21 cm. Cube D with a side of 12 cm. Cuboid E that is 68 cm by 15 cm by 48 cm. Water from a tap above flows down at a rate of 3.6 litres per minute while water is drained out from the bottom at a rate of 2 litre per minute. How long did it take to fill up the tank to a height of 66 cm from the base? Give the answer in minutes correct to nearest whole number.