Question
The figure shows a container made up of 3 sections. Cuboid H with a square base of side 14 cm and height 35 cm. Cube J with a side of 10 cm. Cuboid K that is 65 cm by 16 cm by 43 cm. Water from a tap above flows down at a rate of 2.7 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the container to a height of 63 cm from the base? Give the answer in minutes correct to nearest whole number.
3 m

Click button first when a symbol is required. X

The figure shows a container made up of 3 sections. Cuboid H with a square base of side 14 cm and height 35 cm. Cube J with a side of 10 cm. Cuboid K that is 65 cm by 16 cm by 43 cm. Water from a tap above flows down at a rate of 2.7 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the container to a height of 63 cm from the base? Give the answer in minutes correct to nearest whole number.