Question
The figure shows a container made up of 3 sections. Cuboid X with a square base of side 4 cm and height 24 cm. Cube Y with a side of 11 cm. Cuboid Z that is 67 cm by 12 cm by 43 cm. Water from a tap above flows down at a rate of 3.1 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the container to a height of 64 cm from the base? Give the answer in minutes correct to nearest whole number.
3 m

Click button first when a symbol is required. X

The figure shows a container made up of 3 sections. Cuboid X with a square base of side 4 cm and height 24 cm. Cube Y with a side of 11 cm. Cuboid Z that is 67 cm by 12 cm by 43 cm. Water from a tap above flows down at a rate of 3.1 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the container to a height of 64 cm from the base? Give the answer in minutes correct to nearest whole number.