Question
The figure shows a container made up of 3 sections. Cuboid G with a square base of side 4 cm and height 32 cm. Cube H with a side of 14 cm. Cuboid J that is 80 cm by 14 cm by 44 cm. Water from a tap above flows down at a rate of 2.1 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the container to a height of 64 cm from the base? Give the answer in minutes correct to nearest whole number.
3 m

Click button first when a symbol is required. X

The figure shows a container made up of 3 sections. Cuboid G with a square base of side 4 cm and height 32 cm. Cube H with a side of 14 cm. Cuboid J that is 80 cm by 14 cm by 44 cm. Water from a tap above flows down at a rate of 2.1 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the container to a height of 64 cm from the base? Give the answer in minutes correct to nearest whole number.