Question
The figure shows a tank made up of 3 sections. Cuboid B with a square base of side 9 cm and height 39 cm. Cube C with a side of 13 cm. Cuboid D that is 68 cm by 18 cm by 43 cm. Water from a tap above flows down at a rate of 3.3 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the tank to a height of 63 cm from the base? Give the answer in minutes correct to nearest whole number.
3 m

Click button first when a symbol is required. X

The figure shows a tank made up of 3 sections. Cuboid B with a square base of side 9 cm and height 39 cm. Cube C with a side of 13 cm. Cuboid D that is 68 cm by 18 cm by 43 cm. Water from a tap above flows down at a rate of 3.3 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the tank to a height of 63 cm from the base? Give the answer in minutes correct to nearest whole number.