The figure shows a tank made up of 3 sections. Cuboid Z with a square base of side 9 cm and height 40 cm. Cube A with a side of 13 cm. Cuboid B that is 74 cm by 10 cm by 42 cm. Water from a tap above flows down at a rate of 2.2 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the tank to a height of 62 cm from the base? Give the answer in minutes correct to nearest whole number.
3 m

Click button first when a symbol is required. X

The figure shows a tank made up of 3 sections. Cuboid Z with a square base of side 9 cm and height 40 cm. Cube A with a side of 13 cm. Cuboid B that is 74 cm by 10 cm by 42 cm. Water from a tap above flows down at a rate of 2.2 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the tank to a height of 62 cm from the base? Give the answer in minutes correct to nearest whole number.