Question
The figure shows a container made up of 3 sections. Cuboid G with a square base of side 14 cm and height 42 cm. Cube H with a side of 10 cm. Cuboid J that is 60 cm by 30 cm by 48 cm. Water from a tap above flows down at a rate of 3.2 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the container to a height of 65 cm from the base? Give the answer in minutes correct to nearest whole number.
3 m

Click button first when a symbol is required. X

The figure shows a container made up of 3 sections. Cuboid G with a square base of side 14 cm and height 42 cm. Cube H with a side of 10 cm. Cuboid J that is 60 cm by 30 cm by 48 cm. Water from a tap above flows down at a rate of 3.2 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the container to a height of 65 cm from the base? Give the answer in minutes correct to nearest whole number.