The figure shows a tank made up of 3 sections. Cuboid A with a square base of side 14 cm and height 24 cm. Cube B with a side of 10 cm. Cuboid C that is 65 cm by 23 cm by 45 cm. Water from a tap above flows down at a rate of 3.2 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the tank to a height of 69 cm from the base? Give the answer in minutes correct to nearest whole number.
3 m

Click button first when a symbol is required. X

The figure shows a tank made up of 3 sections. Cuboid A with a square base of side 14 cm and height 24 cm. Cube B with a side of 10 cm. Cuboid C that is 65 cm by 23 cm by 45 cm. Water from a tap above flows down at a rate of 3.2 litres per minute while water is drained out from the bottom at a rate of 1 litre per minute. How long did it take to fill up the tank to a height of 69 cm from the base? Give the answer in minutes correct to nearest whole number.