Question
The figure shows a tank made up of 3 sections. Cuboid Z with a square base of side 14 cm and height 32 cm. Cube A with a side of 13 cm. Cuboid B that is 68 cm by 26 cm by 44 cm. Water from a tap above flows down at a rate of 2.4 litres per minute while water is drained out from the bottom at a rate of 2 litre per minute. How long did it take to fill up the tank to a height of 67 cm from the base? Give the answer in minutes correct to nearest whole number.
3 m

Click button first when a symbol is required. X

The figure shows a tank made up of 3 sections. Cuboid Z with a square base of side 14 cm and height 32 cm. Cube A with a side of 13 cm. Cuboid B that is 68 cm by 26 cm by 44 cm. Water from a tap above flows down at a rate of 2.4 litres per minute while water is drained out from the bottom at a rate of 2 litre per minute. How long did it take to fill up the tank to a height of 67 cm from the base? Give the answer in minutes correct to nearest whole number.